The purpose of the proposed project activity is to generate renewable electricity to be delivered to the Turkish National Power Grid by utilizing water resources. The project activity is located at the Golyaka Town, Duuzce Province, Turkey. The total installed capacity of the Project is 46.2 MW. The electricity is going to be produced without causing airborne pollutants or Green House Gas (GHG) emissions.