Huizhou LNG Power Generation Project (HLPGP) has constructed a highly efficient Natural Gas (NG) fired Combined-Cycle Gas Turbine (CCGT) power plant. The proposed project has a capacity of 1083.09 MW (3¡Á361.03 MW) with annual output of 3703.5 GWh. All three units are now in operation. The proposed project will have an annual consumption of 506,100 tons of Liquefied Natural Gas (LNG), which will be regasified at the LNG terminal and transport to the power station via pipeline.