Sichuan Furong Coal Mine Methane Utilization Project

The Sichuan Furong Coal Mine Methane Utilization Project in China captures and uses coal mine methane for power generation.

Industrial Methane Emissions

Sichuan Furong Coal Mine Methane Utilization Project (hereinafter referred to as the ¡°project¡±) will be implemented by the Sichuan Furong Group¡¯s Limited Industrial Company (hereinafter referred to as ¡°Furong Group¡±). The project is located in Yibin city in Sichuan Province, China. The primary objective of the project is to capture and use coal mine methane (¡°CMM¡±) for power generation.

Projects gallery

No items found.
Sichuan Furong Coal Mine Methane Utilization Project
Icon Email - Localfinder X Webflow Template
Icon Phone - Localfinder X Webflow Template
Icon Location - Localfinder X Webflow Template
Sichuan, China
REDD
VCS1446
CCB GOLD
2.79 million VCUs
24 °C
Buy Now